Geotechnical Investigation for Bridges
Conquering the Terrain: Luding Grand Bridge Survey
Challenge: Relocate drill rigs on sheer cliffs for the Sichuan-Tibet Railway.
Solution: Low-cost, highly secure installation methods.
Result: Unmatched adaptability to extreme sites with custom-built platforms that turned impossible terrain into manageable operations.

Back